Overview: What to Expect During Driveway Construction
A new driveway is one of the fastest ways to boost curb appeal and protect your vehicles. Yet most homeowners have never watched the process unfold day-by-day. Knowing the sequence keeps surprises (and stress) to a minimum, helps you prep your property, and gives you confidence that the crew is hitting industry benchmarks.
This walk-through follows a typical 4–6 day asphalt or concrete install. Smaller gravel or paver jobs compress into 2–3 days; elaborate stamped concrete or heated driveways can stretch past a week. Adjust the timeline with your contractor, but the daily milestones stay the same.
Pre-Construction Checklist (1–2 Weeks Out)
Work completed before the trucks roll up determines 80 % of the final quality. Knock these items out early and construction week will run like clockwork.
Permits & Paperwork
- Verify city or HOA permits; most municipalities require a 24–48 h notice before paving.
- Ask for proof of insurance (general liability + worker’s comp) and the written warranty.
- Approve the final drawing: dimensions, slope for drainage, and location of expansion joints.
Utilities & Sprinklers
Call 811 for a free utility mark-out. Flag your sprinkler heads and low-voltage lighting; the crew will hand-dig within 24 in of those lines.
Access & Storage
- Relocate vehicles, boats, and RVs at least 100 ft from the work zone.
- Designate a soil or gravel staging area; heavy equipment can rut wet lawns.
- Notify neighbors of temporary street blockage; post “No Parking” signs 48 h in advance.
Weather Buffer
Book a tentative start date, then confirm 24 h ahead. A dry forecast with temps above 50 °F is ideal for asphalt; concrete needs 24 h without heavy rain and at least 32 °F overnight.
Day 1: Site Prep & Old Driveway Removal
Arrival window: 7–8 a.m. Equipment: skid-steer, dump truck, plate compactor.
Step 1 – Saw-Cutting & Breaking
The crew scores the existing pavement so removal stops at the property line. An asphalt mill or hydraulic breaker chews the surface into fist-sized chunks.
What you’ll hear: steady jack-hammer thuds (ear protection recommended if you work from home).
Step 2 – Haul-Off
Debris is loaded “live” into dump trucks and hauled to a recycling yard. Expect 4–8 tons per 1,000 sq ft of 3-in-thick asphalt—keep kids and pets inside while trucks maneuver.
Step 3 – Subgrade Probe
Once bare soil is exposed, the foreman checks for soft spots by driving a steel rod every 10 ft. Mushy clay gets removed and replaced with 21-A crushed stone; this prevents future sinkholes.
End-of-Day Check
- Driveway entrance barricaded with caution tape.
- Street swept clean; municipal code fines start at $250 for debris in gutters.
- Photos taken for permit inspector.
Day 2: Base Installation & Compaction
Aggregate Delivery
Dump trucks shuttle in 4–8 in of crushed stone (item #4 or 21-A). Each layer is 2–3 in thick; multiple lifts create a locked-in foundation.
Grading for Drainage
Laser transits shoot a 1 % minimum slope (1 in of fall per 8 ft) toward the street or swale. Ask to see the digital readout—puddles form fast on what looks “flat” to the eye.
Moisture & Compaction
Water trucks lightly mist the stone; optimum moisture acts like glue during compaction. A vibratory roller makes 3–4 passes until the density gauge hits 95 % Standard Proctor.
Practical Tip for Homeowners
Walk the base before nightfall. Footprints should barely leave a ¼-in indentation. If you sink deeper, request another roller pass; you’ll never get this chance again once pavement goes down.
Day 3: First Course (Asphalt) or Forming (Concrete)
Asphalt Driveways – Binder Course
A 2–3-in layer of coarse “binder” asphalt (¾-in stone mix) is laid at 300 °F. The crew rakes seams by hand around garage aprons and tight corners. You can walk on it in 2 h, but keep cars off.
Concrete Driveways – Forming & Reinforcement
1×4 or 1×6 lumber outlines the perimeter; stakes every 3 ft prevent bowing under the weight of concrete. #4 rebar (½ in) or 6×6 welded wire mesh is chaired 2 in off the base so steel sits in the middle of the 4-in slab. Request fiber-mesh additive for micro-crack resistance.
Final Checks Before Pour
- Expansion joint foam placed against garage floor (prevents slab binding).
- Control joint layout marked every 10–12 ft; helps guide future cracks.
- Concrete mix design ticket left on site; confirm 4,000 psi minimum and 5–7 % air entrainment for freeze-thaw climates.
Day 4: Surface Course (Asphalt) or Concrete Pour
Asphalt – Top Course
A 1½-in “finish” layer of fine-graded asphalt is laid and rolled repeatedly at 250–275 °F. Edge trowels create a 45° bevel for clean lines and resistance to chipping.
Concrete – Pour & Screed
Ready-mix trucks arrive at 15-min intervals. Chutes, wheelbarrows, or a pump truck move concrete to the forms. The crew screeds with a 10-ft straightedge, then bull-floats to close surface pores. Color hardener or integral color goes on now if you upgraded to decorative concrete.
Jointing & Initial Cure
Within 2 h, control joints are cut 1-in deep with a groover or early-entry saw. Plastic sheeting or curing compound is applied to lock in moisture for 3–7 days.
What You Should Do Today
Stay off the fresh surface. Keep sprinkler systems off to avoid water stains. Snap photos for your records and note the truck numbers in case of a mix dispute later.
Day 5: Final Details & Initial Cure
Seal-coat Edge & Cleanup (Asphalt)
Optional: a fog seal is sprayed on edges to enrich color; full seal-coating waits 30–90 days. Equipment is loaded; magnetic broom picks up stray nails.
Remove Forms & Patch (Concrete)
Forms come off after 24 h; edges are patched with a slurry mix. If you chose exposed-aggregate, the surface is washed and brushed today to reveal stones.
Inspector Sign-Off
Most cities require a final inspection before you park on the drive. Have your permit card ready and keep vehicles off until you get the green tag.
Day 6–7: Curing, Cooling & Handover
Asphalt Cooling
Surface temp drops 5–7 °F per hour; wait 24–48 h before the first car, 72 h for heavier trucks. Turn tires while stationary to prevent power-steering scuffs.
Concrete Moisture Cure
Spray the slab lightly twice daily in hot weather; cover with breathable burlap if temps exceed 90 °F. Full strength (4,000 psi) is achieved at 28 days, but light vehicle traffic is okay after 7 days on standard 4-in residential slabs.
Final Walk-Through
- Check crack control joints; they should be straight and evenly spaced.
- Look for surface blemishes wider than ⅛ in; request a cosmetic touch-up.
- Collect written warranty (2–5 years on asphalt, 5–10 years on concrete) and maintenance instructions.
Common Issues & How to Prevent Them
Rutting or Tire Marks
Caused by driving too soon or turning wheels while parked. Post a “No Turning” sign for the first week.
Surface Cracks Within 30 Days
Usually shrinkage cracks in concrete. Verify joints were cut within the “window” (4–12 h after pour). Seal hairlines with polyurethane caulk to block water.
Drainage Puddles
Anything deeper than ¼ in after a rain should be addressed free-of-charge under workmanship warranty; document with photos.
Pro Tips for a Longer-Lasting Driveway
- Seal asphalt every 2–3 years; concrete every 5–7 years.
- Avoid rock salt the first winter; use calcium chloride instead.
- Place plywood under motorcycle kickstands, trailer tongues, and RV jacks.
- Redirect downspouts so roof water doesn’t sheet across the surface.
Frequently Asked Questions
Asphalt: 24–48 h for cars, 72 h for trucks. Concrete: 7 days for passenger vehicles, 28 days for heavy loads (RV, dumpster).
Light drizzle: crew covers fresh concrete with tarps and waits; asphalt work pauses until surface is dry. Heavy rain: job postponed to avoid washouts and poor adhesion.
No, but remain reachable by phone for quick decisions (color approval, additional stone, inspector questions). Ensure pets and kids stay indoors while heavy equipment operates.
Over 80 % of driveway failures start below the surface. A well-compacted crushed-stone base distributes vehicle weight, prevents frost heave, and stops potholes before they start.